Taoranting Park of Beijing

 

E'chibei Pavilion

  • Objective
    the water purification of ponds in the park
  • Completion
    25th September, 2006
  • content:
    water area
    540㎡
     
  • content:
    floating-island area
    12㎡
     
  • Content:
    floating-island plants
    China rose, vinca
     
  • Construction condition,
    results
    ransparency:
    10cm before completion, 110cm after completion

September 2006 (completion)

The transparency was confirmed 1 month latter.

Baipo Pavilion

  • Objective
    the water purification of ponds in the park
  • Completion
    30th September, 2007
  • content:
    water area
    2000㎡
     
  • content:
    floating-island area
    40㎡
     
  • Construction condition,
    results
    chrysanthemum
     

September 2007

May 2008

Yueji (China Rose) Garden fountain

  • Objective
    the water purification of fountains in the park
  • Completion
    30th September, 2007
  • Content:
    floating-island plant
    mini China rose
     

before completion

after completion

Outside supplemental water sources (drainage from sewage treatment plant)

  • Objective
    the filtration and purification of the outside supplemental water sources
  • Completion
    25th September, 2006

Compare the waters before and after being filtered by GBC material (15 minutes' filtration, running water)


Return to Top